Triple
T21086306
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Jakarta–Merak corridor |
E519497
|
entity |
| Predicate | hasComponent |
P35
|
FINISHED |
| Object | Jakarta–Merak Toll Road |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Jakarta–Merak Toll Road | Statement: [Jakarta–Merak corridor, hasComponent, Jakarta–Merak Toll Road]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Jakarta–Merak Toll Road Context triple: [Jakarta–Merak corridor, hasComponent, Jakarta–Merak Toll Road]
-
A.
Jakarta–Cikampek Toll Road
The Jakarta–Cikampek Toll Road is a major expressway in West Java, Indonesia, that connects Jakarta with the industrial and commuter cities to its east and serves as a key corridor for regional traffic and logistics.
-
B.
Jakarta–Merak corridor
The Jakarta–Merak corridor is a major transportation axis in western Java, Indonesia, linking the capital region around Jakarta with the key ferry port of Merak that connects Java to Sumatra.
-
C.
Soreang–Pasir Koja Toll Road
The Soreang–Pasir Koja Toll Road is a toll expressway in West Java, Indonesia, that connects the town of Soreang with the city of Bandung, improving regional accessibility and travel times.
-
D.
Trans-Java Toll Road
The Trans-Java Toll Road is a major expressway network spanning the length of Java Island in Indonesia, designed to enhance connectivity, reduce travel time, and support economic growth across the island’s key cities and industrial regions.
-
E.
Jakarta Inner Ring Road
The Jakarta Inner Ring Road is a major toll expressway encircling central Jakarta, helping to distribute traffic between key districts including East Jakarta.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Jakarta–Merak Toll Road Target entity description: The Jakarta–Merak Toll Road is a major expressway in Indonesia that connects the capital city Jakarta with the port city of Merak, serving as a key route for passenger and freight traffic between Java and Sumatra.
-
A.
Jakarta–Cikampek Toll Road
The Jakarta–Cikampek Toll Road is a major expressway in West Java, Indonesia, that connects Jakarta with the industrial and commuter cities to its east and serves as a key corridor for regional traffic and logistics.
-
B.
Jakarta–Merak corridor
chosen
The Jakarta–Merak corridor is a major transportation axis in western Java, Indonesia, linking the capital region around Jakarta with the key ferry port of Merak that connects Java to Sumatra.
-
C.
Soreang–Pasir Koja Toll Road
The Soreang–Pasir Koja Toll Road is a toll expressway in West Java, Indonesia, that connects the town of Soreang with the city of Bandung, improving regional accessibility and travel times.
-
D.
Trans-Java Toll Road
The Trans-Java Toll Road is a major expressway network spanning the length of Java Island in Indonesia, designed to enhance connectivity, reduce travel time, and support economic growth across the island’s key cities and industrial regions.
-
E.
Jakarta Inner Ring Road
The Jakarta Inner Ring Road is a major toll expressway encircling central Jakarta, helping to distribute traffic between key districts including East Jakarta.
- F. None of above.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b507dd9081908fb8bfcbef4c8b46 |
completed | April 16, 2026, 10:08 a.m. |
| NER | Named-entity recognition | batch_69e7094ad1c08190a4b9d2668a6362b2 |
completed | April 21, 2026, 5:21 a.m. |
Created at: April 16, 2026, 2:50 p.m.