Triple
T2105538
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | K-25 Project |
E37185
|
entity |
| Predicate | codeName |
P744
|
FINISHED |
| Object | K-25 |
E37185
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: K-25 | Statement: [K-25 Project, codeName, K-25]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: K-25 Context triple: [K-25 Project, codeName, K-25]
-
A.
K-25 Project
chosen
The K-25 Project was a World War II–era Manhattan Project effort to build and operate a massive gaseous diffusion plant for uranium enrichment in Oak Ridge, Tennessee.
-
B.
K-West Reactor
K-West Reactor is one of the plutonium production reactors at the Hanford Site in Washington State, historically used to support the U.S. nuclear weapons program.
-
C.
K Reactor
K Reactor is a decommissioned nuclear production reactor at the Savannah River Site in South Carolina that was used primarily for producing weapons-grade materials during the Cold War.
-
D.
D Reactor
D Reactor was one of the early plutonium production reactors at the Hanford Site in Washington, built during the Manhattan Project to support the U.S. nuclear weapons program.
-
E.
X-10 graphite reactor
The X-10 graphite reactor was an early nuclear reactor at Oak Ridge, Tennessee, built during the Manhattan Project as a pilot plant for plutonium production and a key step toward the development of nuclear weapons and nuclear energy.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a8861828948190924aa30c08806b3a |
completed | March 4, 2026, 7:20 p.m. |
| NER | Named-entity recognition | batch_69abbadcd4a081909d60b9b241950335 |
completed | March 7, 2026, 5:42 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ae306bee8881908c62306fb1f6aea1 |
completed | March 9, 2026, 2:29 a.m. |
Created at: March 4, 2026, 7:43 p.m.