Triple

T2105538
Position Surface form Disambiguated ID Type / Status
Subject K-25 Project E37185 entity
Predicate codeName P744 FINISHED
Object K-25 E37185 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: K-25 | Statement: [K-25 Project, codeName, K-25]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: K-25
Context triple: [K-25 Project, codeName, K-25]
  • A. K-25 Project chosen
    The K-25 Project was a World War II–era Manhattan Project effort to build and operate a massive gaseous diffusion plant for uranium enrichment in Oak Ridge, Tennessee.
  • B. K-West Reactor
    K-West Reactor is one of the plutonium production reactors at the Hanford Site in Washington State, historically used to support the U.S. nuclear weapons program.
  • C. K Reactor
    K Reactor is a decommissioned nuclear production reactor at the Savannah River Site in South Carolina that was used primarily for producing weapons-grade materials during the Cold War.
  • D. D Reactor
    D Reactor was one of the early plutonium production reactors at the Hanford Site in Washington, built during the Manhattan Project to support the U.S. nuclear weapons program.
  • E. X-10 graphite reactor
    The X-10 graphite reactor was an early nuclear reactor at Oak Ridge, Tennessee, built during the Manhattan Project as a pilot plant for plutonium production and a key step toward the development of nuclear weapons and nuclear energy.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8861828948190924aa30c08806b3a completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69abbadcd4a081909d60b9b241950335 completed March 7, 2026, 5:42 a.m.
NED1 Entity disambiguation (via context triple) batch_69ae306bee8881908c62306fb1f6aea1 completed March 9, 2026, 2:29 a.m.
Created at: March 4, 2026, 7:43 p.m.