Triple

T2105514
Position Surface form Disambiguated ID Type / Status
Subject K-25 Project E37185 entity
Predicate instanceOf P0 FINISHED
Object uranium enrichment plant C6992 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: uranium enrichment plant
Context triple: [K-25 Project, instanceOf, uranium enrichment plant]
  • A. uranium enrichment facility chosen
    A uranium enrichment facility is an industrial complex that increases the concentration of the fissile isotope U-235 in uranium to produce fuel for nuclear reactors or material for nuclear weapons.
  • B. weapons-grade plutonium production facility
    A weapons-grade plutonium production facility is an industrial complex designed to produce, extract, and process plutonium with isotopic compositions suitable for use in nuclear weapons.
  • C. plutonium production reactor
    A plutonium production reactor is a nuclear reactor specifically designed and operated to irradiate uranium fuel and efficiently generate plutonium-239 for use in nuclear weapons or reactor fuel.
  • D. nuclear reactor
    A nuclear reactor is a controlled system that initiates, sustains, and regulates a nuclear fission chain reaction to produce heat, typically for generating electricity or powering ships.
  • E. graphite-moderated nuclear reactor
    A graphite-moderated nuclear reactor is a type of nuclear fission reactor that uses graphite as a neutron moderator to slow down fast neutrons, enabling sustained chain reactions in its fuel.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8861828948190924aa30c08806b3a completed March 4, 2026, 7:20 p.m.
Created at: March 4, 2026, 7:43 p.m.