Triple

T21032604
Position Surface form Disambiguated ID Type / Status
Subject Hisingen E518099 entity
Predicate connectedBy P37 FINISHED
Object Lundbytunneln NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Lundbytunneln | Statement: [Hisingen, connectedBy, Lundbytunneln]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Lundbytunneln
Context triple: [Hisingen, connectedBy, Lundbytunneln]
  • A. Bømlafjord Tunnel
    Bømlafjord Tunnel is a subsea road tunnel in Vestland county, Norway, forming part of the fixed link connection between the island municipality of Bømlo and the mainland.
  • B. Tingstadstunneln chosen
    Tingstadstunneln is a major road tunnel in Gothenburg, Sweden, carrying the E6 motorway under the Göta älv and serving as a key traffic link between Hisingen island and the mainland.
  • C. Lærdal Tunnel
    The Lærdal Tunnel is a 24.5-kilometer road tunnel in Norway, renowned as one of the world's longest road tunnels and a key link between Oslo and Bergen.
  • D. Eiksund Tunnel
    The Eiksund Tunnel is a deep undersea road tunnel in western Norway that links islands in Møre og Romsdal county to the mainland as part of the regional highway network.
  • E. Karmøytunnelen
    Karmøytunnelen is an undersea road tunnel in Rogaland county, Norway, connecting the island of Karmøy to the mainland as part of the regional road network.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b503275c8190afd9a163f997c709 completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e6fc83828c81909c1ec745c0313c9f completed April 21, 2026, 4:26 a.m.
Created at: April 16, 2026, 1:56 p.m.