Triple

T21021543
Position Surface form Disambiguated ID Type / Status
Subject Carolina Harbor Waterpark E517819 entity
Predicate integrationStatus P111921 FINISHED
Object fully integrated under Carowinds brand LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: fully integrated under Carowinds brand | Statement: [Carolina Harbor Waterpark, integrationStatus, fully integrated under Carowinds brand]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: integrationStatus
Context triple: [Carolina Harbor Waterpark, integrationStatus, fully integrated under Carowinds brand]
  • A. integrationOutcome chosen
    Indicates the result or consequence produced when two or more components, systems, or processes are combined or integrated.
  • B. automationStatus
    Indicates whether a process, task, or system is being performed automatically or requires manual intervention.
  • C. interactionStatus
    Indicates the current state or condition of an interaction or exchange occurring between entities.
  • D. implementationStatus
    Indicates the current state or progress of carrying out or realizing something, such as a plan, design, or requirement.
  • E. ICCStatus
    Indicates the current standing or classification of an entity with respect to the International Criminal Court (ICC), such as whether it is under investigation, indicted, convicted, or not subject to ICC proceedings.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b50262b081909bc488937145eb73 completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e6fc5db0b88190ae61ea8b38e8ecf7 completed April 21, 2026, 4:26 a.m.
PD Predicate disambiguation batch_69e5dbf274ac81909bbf245627dc8fdc completed April 20, 2026, 7:55 a.m.
Created at: April 16, 2026, 1:54 p.m.