Triple

T20986998
Position Surface form Disambiguated ID Type / Status
Subject Vacha River E516915 entity
Predicate hasHydroelectricPlant P15311 FINISHED
Object Krichim Hydroelectric Power Plant NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Krichim Hydroelectric Power Plant | Statement: [Vacha River, hasHydroelectricPlant, Krichim Hydroelectric Power Plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Krichim Hydroelectric Power Plant
Context triple: [Vacha River, hasHydroelectricPlant, Krichim Hydroelectric Power Plant]
  • A. Uch-Kurgan Hydroelectric Power Plant
    Uch-Kurgan Hydroelectric Power Plant is a Soviet-era hydroelectric station on the Naryn River in Kyrgyzstan that forms part of the country’s major cascade of power-generating dams.
  • B. Shamaldy-Sai Hydroelectric Power Plant
    The Shamaldy-Sai Hydroelectric Power Plant is a hydroelectric station in Kyrgyzstan that generates electricity using water flows regulated by the Toktogul Reservoir on the Naryn River.
  • C. Zhinvali Hydroelectric Power Plant
    The Zhinvali Hydroelectric Power Plant is a hydroelectric facility in Georgia that generates electricity using water impounded by the Zhinvali Dam on the Aragvi River.
  • D. Tash-Kumyr Hydroelectric Power Plant
    Tash-Kumyr Hydroelectric Power Plant is a hydroelectric facility in Kyrgyzstan that generates electricity from the Naryn River as part of a cascade of dams and power stations.
  • E. Khrami II Hydroelectric Power Plant
    Khrami II Hydroelectric Power Plant is a hydroelectric facility on the Khrami River in Georgia that generates electricity by harnessing the river’s flow through a dam-based power station.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Krichim Hydroelectric Power Plant
Target entity description: Krichim Hydroelectric Power Plant is a Bulgarian hydroelectric facility that generates electricity using the waters of the Vacha River in the Rhodope Mountains.
  • A. Uch-Kurgan Hydroelectric Power Plant
    Uch-Kurgan Hydroelectric Power Plant is a Soviet-era hydroelectric station on the Naryn River in Kyrgyzstan that forms part of the country’s major cascade of power-generating dams.
  • B. Shamaldy-Sai Hydroelectric Power Plant
    The Shamaldy-Sai Hydroelectric Power Plant is a hydroelectric station in Kyrgyzstan that generates electricity using water flows regulated by the Toktogul Reservoir on the Naryn River.
  • C. Zhinvali Hydroelectric Power Plant
    The Zhinvali Hydroelectric Power Plant is a hydroelectric facility in Georgia that generates electricity using water impounded by the Zhinvali Dam on the Aragvi River.
  • D. Tash-Kumyr Hydroelectric Power Plant
    Tash-Kumyr Hydroelectric Power Plant is a hydroelectric facility in Kyrgyzstan that generates electricity from the Naryn River as part of a cascade of dams and power stations.
  • E. Khrami II Hydroelectric Power Plant
    Khrami II Hydroelectric Power Plant is a hydroelectric facility on the Khrami River in Georgia that generates electricity by harnessing the river’s flow through a dam-based power station.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4ffac148190bbade9f0eceb660b completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6fbe3fbac819086d3079aaddca5b1 completed April 21, 2026, 4:24 a.m.
Created at: April 16, 2026, 1:49 p.m.