Triple
T20986997
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Vacha River |
E516915
|
entity |
| Predicate | hasHydroelectricPlant |
P15311
|
FINISHED |
| Object | Tsankov Kamak Hydroelectric Power Plant |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tsankov Kamak Hydroelectric Power Plant | Statement: [Vacha River, hasHydroelectricPlant, Tsankov Kamak Hydroelectric Power Plant]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Tsankov Kamak Hydroelectric Power Plant Context triple: [Vacha River, hasHydroelectricPlant, Tsankov Kamak Hydroelectric Power Plant]
-
A.
Khrami II Hydroelectric Power Plant
Khrami II Hydroelectric Power Plant is a hydroelectric facility on the Khrami River in Georgia that generates electricity by harnessing the river’s flow through a dam-based power station.
-
B.
Khrami I Hydroelectric Power Plant
Khrami I Hydroelectric Power Plant is a hydroelectric facility on the Khrami River in Georgia that generates electricity by harnessing the river’s flow through a dam-based power station.
-
C.
Tash-Kumyr Hydroelectric Power Plant
Tash-Kumyr Hydroelectric Power Plant is a hydroelectric facility in Kyrgyzstan that generates electricity from the Naryn River as part of a cascade of dams and power stations.
-
D.
Lotru-Ciunget Hydropower Plant
The Lotru-Ciunget Hydropower Plant is a major Romanian hydroelectric facility that harnesses the Lotru River to generate electricity for the national grid.
-
E.
Uch-Kurgan Hydroelectric Power Plant
Uch-Kurgan Hydroelectric Power Plant is a Soviet-era hydroelectric station on the Naryn River in Kyrgyzstan that forms part of the country’s major cascade of power-generating dams.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Tsankov Kamak Hydroelectric Power Plant Target entity description: Tsankov Kamak Hydroelectric Power Plant is a Bulgarian hydroelectric facility that harnesses the waters of the Vacha River as part of the Vacha Cascade energy system.
-
A.
Khrami II Hydroelectric Power Plant
Khrami II Hydroelectric Power Plant is a hydroelectric facility on the Khrami River in Georgia that generates electricity by harnessing the river’s flow through a dam-based power station.
-
B.
Khrami I Hydroelectric Power Plant
Khrami I Hydroelectric Power Plant is a hydroelectric facility on the Khrami River in Georgia that generates electricity by harnessing the river’s flow through a dam-based power station.
-
C.
Tash-Kumyr Hydroelectric Power Plant
Tash-Kumyr Hydroelectric Power Plant is a hydroelectric facility in Kyrgyzstan that generates electricity from the Naryn River as part of a cascade of dams and power stations.
-
D.
Lotru-Ciunget Hydropower Plant
The Lotru-Ciunget Hydropower Plant is a major Romanian hydroelectric facility that harnesses the Lotru River to generate electricity for the national grid.
-
E.
Uch-Kurgan Hydroelectric Power Plant
Uch-Kurgan Hydroelectric Power Plant is a Soviet-era hydroelectric station on the Naryn River in Kyrgyzstan that forms part of the country’s major cascade of power-generating dams.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4ffac148190bbade9f0eceb660b |
completed | April 16, 2026, 10:07 a.m. |
| NER | Named-entity recognition | batch_69e6fbe3fbac819086d3079aaddca5b1 |
completed | April 21, 2026, 4:24 a.m. |
Created at: April 16, 2026, 1:49 p.m.