Triple

T20986996
Position Surface form Disambiguated ID Type / Status
Subject Vacha River E516915 entity
Predicate hasHydroelectricPlant P15311 FINISHED
Object Vacha Hydroelectric Power Plant NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Vacha Hydroelectric Power Plant | Statement: [Vacha River, hasHydroelectricPlant, Vacha Hydroelectric Power Plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Vacha Hydroelectric Power Plant
Context triple: [Vacha River, hasHydroelectricPlant, Vacha Hydroelectric Power Plant]
  • A. Zhinvali Hydroelectric Power Plant
    The Zhinvali Hydroelectric Power Plant is a hydroelectric facility in Georgia that generates electricity using water impounded by the Zhinvali Dam on the Aragvi River.
  • B. Kurpsai Hydroelectric Power Plant
    Kurpsai Hydroelectric Power Plant is a major hydroelectric facility in Kyrgyzstan that generates electricity by harnessing the flow of the Naryn River.
  • C. Charvak Hydroelectric Power Station
    Charvak Hydroelectric Power Station is a major hydroelectric facility in Uzbekistan that generates electricity using water from the Chirchiq River and the Charvak Reservoir.
  • D. Roseires Hydropower Plant
    Roseires Hydropower Plant is a major hydroelectric facility in Sudan that generates electricity using water impounded by the Roseires Dam on the Blue Nile River.
  • E. Lotru-Ciunget Hydropower Plant
    The Lotru-Ciunget Hydropower Plant is a major Romanian hydroelectric facility that harnesses the Lotru River to generate electricity for the national grid.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Vacha Hydroelectric Power Plant
Target entity description: Vacha Hydroelectric Power Plant is a hydroelectric power station in Bulgaria that harnesses the flow of the Vacha River to generate electricity.
  • A. Zhinvali Hydroelectric Power Plant
    The Zhinvali Hydroelectric Power Plant is a hydroelectric facility in Georgia that generates electricity using water impounded by the Zhinvali Dam on the Aragvi River.
  • B. Kurpsai Hydroelectric Power Plant
    Kurpsai Hydroelectric Power Plant is a major hydroelectric facility in Kyrgyzstan that generates electricity by harnessing the flow of the Naryn River.
  • C. Charvak Hydroelectric Power Station
    Charvak Hydroelectric Power Station is a major hydroelectric facility in Uzbekistan that generates electricity using water from the Chirchiq River and the Charvak Reservoir.
  • D. Roseires Hydropower Plant
    Roseires Hydropower Plant is a major hydroelectric facility in Sudan that generates electricity using water impounded by the Roseires Dam on the Blue Nile River.
  • E. Lotru-Ciunget Hydropower Plant
    The Lotru-Ciunget Hydropower Plant is a major Romanian hydroelectric facility that harnesses the Lotru River to generate electricity for the national grid.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4ffac148190bbade9f0eceb660b completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6fbe3fbac819086d3079aaddca5b1 completed April 21, 2026, 4:24 a.m.
Created at: April 16, 2026, 1:49 p.m.