Triple

T20972178
Position Surface form Disambiguated ID Type / Status
Subject Orlík Reservoir E516529 entity
Predicate createdBy P806 FINISHED
Object Orlík Dam NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Orlík Dam | Statement: [Orlík Reservoir, createdBy, Orlík Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Orlík Dam
Context triple: [Orlík Reservoir, createdBy, Orlík Dam]
  • A. Orava Dam
    Orava Dam is a major hydroelectric and flood-control structure in northern Slovakia that impounds the Orava River to form one of the country’s largest artificial lakes.
  • B. Orlík Reservoir chosen
    Orlík Reservoir is one of the largest artificial lakes in the Czech Republic, created by a dam on the Vltava River and known for hydroelectric power generation, flood control, and recreation.
  • C. Solina Dam
    Solina Dam is a major hydroelectric and flood-control dam in southeastern Poland, known for creating the large artificial Solina Lake in the Bieszczady region.
  • D. Rzeszów Dam
    Rzeszów Dam is a hydraulic structure in southeastern Poland that creates the Rzeszów Reservoir on the Wisłok River, serving purposes such as water management, flood control, and recreation for the city of Rzeszów.
  • E. Grabovica Dam
    Grabovica Dam is a hydroelectric dam on the Neretva River in Bosnia and Herzegovina, forming part of the river’s major power-generation system.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4fee5ac8190875fa9ceba1a5e5e completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6fba161d88190b8905891f449004e completed April 21, 2026, 4:22 a.m.
Created at: April 16, 2026, 1:44 p.m.