Triple

T20965842
Position Surface form Disambiguated ID Type / Status
Subject Mambasa E516363 entity
Predicate locatedOn P40 FINISHED
Object Ituri Road corridor NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ituri Road corridor | Statement: [Mambasa, locatedOn, Ituri Road corridor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Ituri Road corridor
Context triple: [Mambasa, locatedOn, Ituri Road corridor]
  • A. Matadi–Kinshasa corridor
    The Matadi–Kinshasa corridor is a key transport route in the Democratic Republic of the Congo that links the Atlantic port city of Matadi with the inland capital Kinshasa, serving as the country’s main gateway for international trade.
  • B. Umbwe Route
    Umbwe Route is a steep, short, and less-traveled ascent path on Mount Kilimanjaro known for its direct approach and challenging terrain.
  • C. Gulu–Kitgum Road
    Gulu–Kitgum Road is a major transport route in northern Uganda that connects the towns of Gulu and Kitgum, facilitating regional travel and trade.
  • D. Kabale–Kisoro road
    The Kabale–Kisoro road is a major highway in southwestern Uganda that connects the town of Kabale to Kisoro near the borders with Rwanda and the Democratic Republic of the Congo, serving as an important route for regional trade and tourism.
  • E. Nacala Corridor
    The Nacala Corridor is a major transport and logistics route in Mozambique and neighboring countries, linking inland mining and agricultural regions to the Indian Ocean via the Port of Nacala.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Ituri Road corridor
Target entity description: The Ituri Road corridor is a key transportation route running through the Ituri region of northeastern Democratic Republic of the Congo, linking towns like Mambasa and facilitating regional trade and movement.
  • A. Matadi–Kinshasa corridor
    The Matadi–Kinshasa corridor is a key transport route in the Democratic Republic of the Congo that links the Atlantic port city of Matadi with the inland capital Kinshasa, serving as the country’s main gateway for international trade.
  • B. Umbwe Route
    Umbwe Route is a steep, short, and less-traveled ascent path on Mount Kilimanjaro known for its direct approach and challenging terrain.
  • C. Gulu–Kitgum Road
    Gulu–Kitgum Road is a major transport route in northern Uganda that connects the towns of Gulu and Kitgum, facilitating regional travel and trade.
  • D. Kabale–Kisoro road
    The Kabale–Kisoro road is a major highway in southwestern Uganda that connects the town of Kabale to Kisoro near the borders with Rwanda and the Democratic Republic of the Congo, serving as an important route for regional trade and tourism.
  • E. Nacala Corridor
    The Nacala Corridor is a major transport and logistics route in Mozambique and neighboring countries, linking inland mining and agricultural regions to the Indian Ocean via the Port of Nacala.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4fde6c48190af1398e7e734629e completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6fb72ef4c8190bebdd2cef3c2148c completed April 21, 2026, 4:22 a.m.
Created at: April 16, 2026, 1:33 p.m.