Triple
T20938758
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Yamaha Motor Racing |
E515657
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Yamaha factory team |
C42478
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Yamaha factory team Context triple: [Yamaha Motor Racing, instanceOf, Yamaha factory team]
-
A.
motorcycle racing team
chosen
A motorcycle racing team is an organized group that manages riders, motorcycles, mechanics, and support staff to compete in professional or amateur motorcycle racing events.
-
B.
motorcycle speedway team
A motorcycle speedway team is a group of riders and support staff who compete together in organized speedway racing events, representing a club, region, or sponsor in league or tournament competitions.
-
C.
Kawasaki Heavy Industries division
A Kawasaki Heavy Industries division is an organizational unit within the multinational corporation responsible for managing specific product lines or business areas such as aerospace, rolling stock, shipbuilding, energy systems, or industrial equipment.
-
D.
factory-backed motorsport team
A factory-backed motorsport team is a racing organization that receives direct financial, technical, and logistical support from an automobile manufacturer to develop and compete with its vehicles.
-
E.
yacht racing team
A yacht racing team is a coordinated group of sailors and support staff who work together to prepare, navigate, and competitively race a yacht in regattas and sailing competitions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4fc13408190b06868df03c5c29b |
completed | April 16, 2026, 10:07 a.m. |
Created at: April 16, 2026, 12:50 p.m.