Triple

T209238
Position Surface form Disambiguated ID Type / Status
Subject Honeywell DDP-516 E4677 entity
Predicate powerRequirement P100 FINISHED
Object suitable for continuous operation LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: suitable for continuous operation | Statement: [Honeywell DDP-516, powerRequirement, suitable for continuous operation]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: powerRequirement
Context triple: [Honeywell DDP-516, powerRequirement, suitable for continuous operation]
  • A. hasPower
    Indicates that one entity possesses authority, control, or influence over another entity or over a particular domain or resource.
  • B. definesPoweringMode
    Indicates that one entity specifies or determines the operating or powering mode used by another entity.
  • C. requires chosen
    Indicates that one entity must exist, occur, or be satisfied before another entity can exist, occur, or be carried out.
  • D. grantedPower
    Indicates that one entity has conferred authority, control, or a specific capability to another entity.
  • E. usesElectricityStandard
    Indicates that one entity operates according to, or is compatible with, the electricity supply standard defined or used by another entity.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a25737567c81908f9c505300239181 completed Feb. 28, 2026, 2:47 a.m.
NER Named-entity recognition batch_69a25e8b9b908190b69a3f0594b95f7e completed Feb. 28, 2026, 3:18 a.m.
PD Predicate disambiguation batch_69a25b4e3c2881908d83e8218aa9f2d9 completed Feb. 28, 2026, 3:04 a.m.
Created at: Feb. 28, 2026, 2:51 a.m.