Triple

T20921499
Position Surface form Disambiguated ID Type / Status
Subject Long Island Rail Road rolling stock E515218 entity
Predicate electrificationCollectionMethod P5320 FINISHED
Object contact shoe LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: contact shoe | Statement: [Long Island Rail Road rolling stock, electrificationCollectionMethod, contact shoe]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: electrificationCollectionMethod
Context triple: [Long Island Rail Road rolling stock, electrificationCollectionMethod, contact shoe]
  • A. electrificationUsedBy
    Indicates that a particular electrification system, method, or technology is employed or utilized by a given entity.
  • B. electrificationUsedFor
    Indicates that electrification is employed as a means or method to achieve, enable, or support a particular function, process, or purpose.
  • C. electrificationServedBy
    Indicates that the electrification of a system, area, or infrastructure is provided, supported, or enabled by a specified source, service, or entity.
  • D. electrificationSystem chosen
    Indicates the type of electrical power system used to supply energy (typically to infrastructure or vehicles) for operation.
  • E. electrificationEnd
    Indicates the point in time or event at which an electrification process or electrified state comes to an end.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4f9d5ec8190bb2bd27350ed341c completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6f64e56bc81908aa86f2176fcc0db completed April 21, 2026, 4 a.m.
PD Predicate disambiguation batch_69e5c9af1fe08190953366a466950140 completed April 20, 2026, 6:37 a.m.
Created at: April 16, 2026, 12:48 p.m.