Triple

T209139
Position Surface form Disambiguated ID Type / Status
Subject NCP E4675 entity
Predicate instanceOf P0 FINISHED
Object network protocol suite C898 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: network protocol suite
Context triple: [NCP, instanceOf, network protocol suite]
  • A. communication protocol suite chosen
    A communication protocol suite is a coordinated set of network protocols that work together across different layers to enable reliable data exchange between devices in a communication system.
  • B. network protocol
    A network protocol is a standardized set of rules and formats that enable computers and devices to communicate and exchange data reliably over a network.
  • C. internet protocol suite
    The internet protocol suite is a conceptual framework of layered communication protocols (including TCP/IP) that defines how data is formatted, addressed, transmitted, routed, and received across interconnected computer networks.
  • D. network security protocol
    A network security protocol is a defined set of rules and procedures that protect data integrity, confidentiality, and authenticity during communication between devices over a network.
  • E. network layer protocol
    A network layer protocol defines the rules and mechanisms for routing and forwarding data packets across interconnected networks, providing logical addressing and path selection between source and destination hosts.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a25737567c81908f9c505300239181 completed Feb. 28, 2026, 2:47 a.m.
Created at: Feb. 28, 2026, 2:51 a.m.