Triple

T2088585
Position Surface form Disambiguated ID Type / Status
Subject Westinghouse air brake system E32613 entity
Predicate instanceOf P0 FINISHED
Object railway braking system C3558 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway braking system
Context triple: [Westinghouse air brake system, instanceOf, railway braking system]
  • A. railway signaling system
    A railway signaling system is an integrated set of trackside and onboard equipment, rules, and communication protocols that control train movements to ensure safe separation, efficient routing, and protection against collisions.
  • B. train control system chosen
    A train control system is a coordinated set of hardware and software components that monitor, regulate, and automate train movements to ensure safe, efficient, and reliable railway operations.
  • C. railway locomotive
    A railway locomotive is a powered rail vehicle that provides the motive force to pull or push trains along railway tracks.
  • D. railway infrastructure element
    A railway infrastructure element is any physical component of a rail system—such as tracks, signals, switches, bridges, or platforms—that supports the safe and efficient operation of trains.
  • E. railway engineering complex
    A railway engineering complex is an integrated facility where railway infrastructure, rolling stock, and related systems are designed, constructed, tested, maintained, and managed.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a885eba0708190999696a45cbec816 completed March 4, 2026, 7:20 p.m.
Created at: March 4, 2026, 7:43 p.m.