Triple

T20860445
Position Surface form Disambiguated ID Type / Status
Subject Ordnance Survey trig pillar E513602 entity
Predicate instanceOf P0 FINISHED
Object concrete pillar C43856 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: concrete pillar
Context triple: [Ordnance Survey trig pillar, instanceOf, concrete pillar]
  • A. stone column
    A stone column is a vertical structural element made of stone that supports loads from above and can also serve as an architectural or decorative feature.
  • B. ornamental column
    An ornamental column is a vertical architectural element designed primarily for decorative purposes, often featuring elaborate carvings, patterns, or motifs that enhance the aesthetic appeal of a structure.
  • C. concrete bridge
    A concrete bridge is a structure built primarily from reinforced or prestressed concrete to span physical obstacles such as roads, rivers, or valleys, providing a durable pathway for vehicles, pedestrians, or rail traffic.
  • D. concrete bridge
    A concrete bridge is a structure built primarily from reinforced or prestressed concrete to span physical obstacles such as roads, rivers, or valleys, providing a durable and stable pathway for transportation.
  • E. concrete buoy monument
    A concrete buoy monument is a permanent, buoy-shaped structure made of reinforced concrete, typically installed on land or in shallow water to mark a significant geographic point, boundary, or commemorative site.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4f5b01081909452f654d2fc3f50 completed April 16, 2026, 10:07 a.m.
Created at: April 16, 2026, 12:44 p.m.