Triple
T20860445
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Ordnance Survey trig pillar |
E513602
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | concrete pillar |
C43856
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: concrete pillar Context triple: [Ordnance Survey trig pillar, instanceOf, concrete pillar]
-
A.
stone column
A stone column is a vertical structural element made of stone that supports loads from above and can also serve as an architectural or decorative feature.
-
B.
ornamental column
An ornamental column is a vertical architectural element designed primarily for decorative purposes, often featuring elaborate carvings, patterns, or motifs that enhance the aesthetic appeal of a structure.
-
C.
concrete bridge
A concrete bridge is a structure built primarily from reinforced or prestressed concrete to span physical obstacles such as roads, rivers, or valleys, providing a durable pathway for vehicles, pedestrians, or rail traffic.
-
D.
concrete bridge
A concrete bridge is a structure built primarily from reinforced or prestressed concrete to span physical obstacles such as roads, rivers, or valleys, providing a durable and stable pathway for transportation.
-
E.
concrete buoy monument
A concrete buoy monument is a permanent, buoy-shaped structure made of reinforced concrete, typically installed on land or in shallow water to mark a significant geographic point, boundary, or commemorative site.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4f5b01081909452f654d2fc3f50 |
completed | April 16, 2026, 10:07 a.m. |
Created at: April 16, 2026, 12:44 p.m.