Triple

T20833741
Position Surface form Disambiguated ID Type / Status
Subject Eeyou E512900 entity
Predicate associatedWith P37 FINISHED
Object James Bay hydroelectric development NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: James Bay hydroelectric development | Statement: [Eeyou, associatedWith, James Bay hydroelectric development]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: James Bay hydroelectric development
Context triple: [Eeyou, associatedWith, James Bay hydroelectric development]
  • A. Hydro-Québec James Bay Project chosen
    The Hydro-Québec James Bay Project is a massive hydroelectric development in northern Quebec comprising a complex of dams, reservoirs, and power stations that harness the region’s large rivers to generate electricity.
  • B. Kemano hydroelectric project
    The Kemano hydroelectric project is a large-scale power generation facility in British Columbia, Canada, built primarily to supply electricity to the Alcan aluminum smelter in Kitimat by harnessing diverted river flows through extensive tunnels and dams.
  • C. Bridge River Power Project
    The Bridge River Power Project is a major hydroelectric development in British Columbia, Canada, consisting of dams, reservoirs, and power stations that harness the Bridge River system to generate electricity.
  • D. Grand Falls hydroelectric dam
    The Grand Falls hydroelectric dam is a major power-generating facility on the Saint John River in New Brunswick, Canada, known for harnessing the river’s dramatic gorge and waterfalls.
  • E. Peace River hydroelectric system
    The Peace River hydroelectric system is a network of large dams, reservoirs, and power stations on British Columbia’s Peace River that generates significant hydroelectric power for western Canada.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4cf62a88190bbf92351e9e57259 completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6c32554648190bd66ac99b3a9072b completed April 21, 2026, 12:21 a.m.
Created at: April 16, 2026, 12:42 p.m.