Triple
T2082650
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Remy’s Ratatouille Adventure |
E45277
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Disney theme park ride |
C5224
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Disney theme park ride Context triple: [Remy’s Ratatouille Adventure, instanceOf, Disney theme park ride]
-
A.
roller coaster
A roller coaster is an amusement ride consisting of a track with steep drops, sharp turns, and inversions that carries passengers in open cars for a thrilling, high-speed experience.
-
B.
dark ride
A dark ride is an indoor amusement attraction where passengers travel in guided vehicles through elaborately themed, low-light environments featuring scenes, special effects, and storytelling.
-
C.
Universal Studios Japan attraction
A Universal Studios Japan attraction is an entertainment experience within the theme park—such as a ride, show, or interactive area—based on popular films, characters, or franchises, designed to immerse guests through themed environments and storytelling.
-
D.
motion simulator ride
A motion simulator ride is an amusement attraction that uses synchronized moving platforms, visual displays, and sound effects to create the immersive illusion of traveling through dynamic environments.
-
E.
3D motion-based ride
chosen
A 3D motion-based ride is an immersive attraction that synchronizes moving seats or ride vehicles with 3D visual media, sound, and special effects to simulate dynamic, realistic motion experiences.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a8891869c88190a02643e3bb746f59 |
completed | March 4, 2026, 7:33 p.m. |
Created at: March 4, 2026, 7:41 p.m.