Triple
T2082647
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Remy’s Ratatouille Adventure |
E45277
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | trackless dark ride |
C4768
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: trackless dark ride Context triple: [Remy’s Ratatouille Adventure, instanceOf, trackless dark ride]
-
A.
dark ride
chosen
A dark ride is an indoor amusement attraction where passengers travel in guided vehicles through elaborately themed, low-light environments featuring scenes, special effects, and storytelling.
-
B.
hybrid dark ride roller coaster
A hybrid dark ride roller coaster is an attraction that combines immersive, story-driven indoor dark ride elements with the high-speed thrills and track features of a traditional roller coaster.
-
C.
roller coaster
A roller coaster is an amusement ride consisting of a track with steep drops, sharp turns, and inversions that carries passengers in open cars for a thrilling, high-speed experience.
-
D.
motion simulator ride
A motion simulator ride is an amusement attraction that uses synchronized moving platforms, visual displays, and sound effects to create the immersive illusion of traveling through dynamic environments.
-
E.
indoor roller coaster
An indoor roller coaster is an amusement ride featuring a track-based, high-speed vehicle system enclosed within a building, often enhanced with controlled lighting, sound, and themed environments.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a8891869c88190a02643e3bb746f59 |
completed | March 4, 2026, 7:33 p.m. |
Created at: March 4, 2026, 7:41 p.m.