Triple

T20817375
Position Surface form Disambiguated ID Type / Status
Subject AEGIS combat system E512476 entity
Predicate platform P1292 FINISHED
Object ROKN Sejong the Great-class destroyer NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: ROKN Sejong the Great-class destroyer | Statement: [AEGIS combat system, platform, ROKN Sejong the Great-class destroyer]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: ROKN Sejong the Great-class destroyer
Context triple: [AEGIS combat system, platform, ROKN Sejong the Great-class destroyer]
  • A. Pohang-class corvettes
    Pohang-class corvettes are South Korean-built coastal defense warships, originally designed for anti-submarine and patrol missions, that have been widely transferred to and operated by allied navies.
  • B. Lekiu-class frigate
    The Lekiu-class frigate is a class of modern guided-missile frigates built in the United Kingdom for Malaysia, serving as some of the Royal Malaysian Navy’s principal surface combatants.
  • C. K-class destroyer
    The K-class destroyer was a group of Royal Navy warships built in the late 1930s, designed for high-speed fleet escort and anti-submarine duties during World War II.
  • D. Koni-class frigate
    The Koni-class frigate is a Soviet-designed anti-submarine and patrol warship built primarily for export to allied navies during the Cold War.
  • E. Type 82 destroyer
    The Type 82 destroyer was a planned class of advanced British guided-missile destroyers intended for fleet air defense in the Royal Navy during the Cold War, of which only HMS Bristol was completed.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: ROKN Sejong the Great-class destroyer
Target entity description: The ROKN Sejong the Great-class destroyer is a South Korean Navy class of large, advanced guided-missile destroyers equipped for area air defense, anti-submarine warfare, and ballistic missile defense.
  • A. Pohang-class corvettes
    Pohang-class corvettes are South Korean-built coastal defense warships, originally designed for anti-submarine and patrol missions, that have been widely transferred to and operated by allied navies.
  • B. Lekiu-class frigate
    The Lekiu-class frigate is a class of modern guided-missile frigates built in the United Kingdom for Malaysia, serving as some of the Royal Malaysian Navy’s principal surface combatants.
  • C. K-class destroyer
    The K-class destroyer was a group of Royal Navy warships built in the late 1930s, designed for high-speed fleet escort and anti-submarine duties during World War II.
  • D. Koni-class frigate
    The Koni-class frigate is a Soviet-designed anti-submarine and patrol warship built primarily for export to allied navies during the Cold War.
  • E. Type 82 destroyer
    The Type 82 destroyer was a planned class of advanced British guided-missile destroyers intended for fleet air defense in the Royal Navy during the Cold War, of which only HMS Bristol was completed.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4cd25088190b48ca9700cd24efc completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6c2f429388190809dd532278fe310 completed April 21, 2026, 12:21 a.m.
Created at: April 16, 2026, 12:41 p.m.