Triple

T20809218
Position Surface form Disambiguated ID Type / Status
Subject wet foot, dry foot policy E512251 entity
Predicate instanceOf P0 FINISHED
Object bilateral migration arrangement C26223 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bilateral migration arrangement
Context triple: [wet foot, dry foot policy, instanceOf, bilateral migration arrangement]
  • A. bilateral commission
    A bilateral commission is a formal joint body established by two parties, typically states or organizations, to negotiate, coordinate, and oversee matters of mutual interest.
  • B. immigration arrangement chosen
    An immigration arrangement is a structured plan or agreement outlining the legal, logistical, and procedural steps by which an individual or group moves and is admitted from one country to another.
  • C. bilateral trade association
    A bilateral trade association is an organization formed between two countries to promote, facilitate, and regulate trade and economic cooperation through agreements, advocacy, and joint initiatives.
  • D. bilateral military agreement
    A bilateral military agreement is a formal pact between two states that outlines mutual defense commitments, security cooperation, and related military obligations and activities.
  • E. labor migration system
    A labor migration system is the structured set of policies, institutions, processes, and social networks that govern and shape the movement of workers across regions or countries, including their recruitment, rights, conditions, and integration.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4cd25088190b48ca9700cd24efc completed April 16, 2026, 10:07 a.m.
Created at: April 16, 2026, 12:40 p.m.