Triple

T20805658
Position Surface form Disambiguated ID Type / Status
Subject Hurricane and Storm Damage Risk Reduction System program E512145 entity
Predicate relatedTo P37 FINISHED
Object Mississippi River and Tributaries Project NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Mississippi River and Tributaries Project | Statement: [Hurricane and Storm Damage Risk Reduction System program, relatedTo, Mississippi River and Tributaries Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Mississippi River and Tributaries Project
Context triple: [Hurricane and Storm Damage Risk Reduction System program, relatedTo, Mississippi River and Tributaries Project]
  • A. Mississippi River and Tributaries Project chosen
    The Mississippi River and Tributaries Project is a comprehensive U.S. Army Corps of Engineers flood-control and navigation system designed to manage the flow and reduce flooding risks throughout the lower Mississippi River basin.
  • B. Yazoo Backwater Project
    The Yazoo Backwater Project is a long-debated U.S. Army Corps of Engineers flood-control initiative in Mississippi’s Yazoo River basin, best known for its controversial proposed pumping station and its environmental and political disputes.
  • C. Tennessee Valley Authority Norris Dam project
    The Tennessee Valley Authority Norris Dam project was a major New Deal-era hydroelectric and flood-control initiative on the Clinch River in Tennessee that created Norris Dam, Norris Lake, and surrounding recreational and conservation areas.
  • D. Sac River flood control project
    The Sac River flood control project is a U.S. Army Corps of Engineers initiative in southwestern Missouri designed to reduce flooding along the Sac River and its tributaries through infrastructure such as Stockton Lake and its dam.
  • E. Red River flood control system
    The Red River flood control system is an integrated network of dams, reservoirs, and related infrastructure designed to manage water flow, reduce flooding, and support water supply and recreation along the Red River.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4cc69f481908e98751e697b9df4 completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6c2cf1cbc819092d92625dfb107d0 completed April 21, 2026, 12:20 a.m.
Created at: April 16, 2026, 12:40 p.m.