Triple

T20792809
Position Surface form Disambiguated ID Type / Status
Subject Lake Brazos E511821 entity
Predicate hasPart P35 FINISHED
Object Brazos Riverwalk NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Brazos Riverwalk | Statement: [Lake Brazos, hasPart, Brazos Riverwalk]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Brazos Riverwalk
Context triple: [Lake Brazos, hasPart, Brazos Riverwalk]
  • A. San Antonio River Walk
    The San Antonio River Walk is a renowned network of walkways along the San Antonio River lined with restaurants, shops, and attractions, serving as a major cultural and tourist hub in downtown San Antonio, Texas.
  • B. Moody City Park
    Moody City Park is a public recreational park in Moody, Alabama, offering outdoor spaces and amenities for community activities and leisure.
  • C. Austin park and trail system
    The Austin park and trail system is an interconnected network of urban parks, greenbelts, and multi-use trails that provide outdoor recreation and scenic access throughout the city of Austin, Texas.
  • D. Rivard Plaza
    Rivard Plaza is a public waterfront park and promenade along the Detroit River, featuring walking paths, green spaces, and recreational amenities as part of Detroit’s revitalized riverfront.
  • E. River Walk
    River Walk is a renowned network of walkways, shops, restaurants, and attractions along the San Antonio River that serves as a major cultural and tourist centerpiece of San Antonio, Texas.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Brazos Riverwalk
Target entity description: The Brazos Riverwalk is a scenic pedestrian and recreational pathway along the Brazos River in Waco, Texas, featuring trails, parks, and riverfront attractions.
  • A. San Antonio River Walk
    The San Antonio River Walk is a renowned network of walkways along the San Antonio River lined with restaurants, shops, and attractions, serving as a major cultural and tourist hub in downtown San Antonio, Texas.
  • B. Moody City Park
    Moody City Park is a public recreational park in Moody, Alabama, offering outdoor spaces and amenities for community activities and leisure.
  • C. Austin park and trail system
    The Austin park and trail system is an interconnected network of urban parks, greenbelts, and multi-use trails that provide outdoor recreation and scenic access throughout the city of Austin, Texas.
  • D. Rivard Plaza
    Rivard Plaza is a public waterfront park and promenade along the Detroit River, featuring walking paths, green spaces, and recreational amenities as part of Detroit’s revitalized riverfront.
  • E. River Walk
    River Walk is a renowned network of walkways, shops, restaurants, and attractions along the San Antonio River that serves as a major cultural and tourist centerpiece of San Antonio, Texas.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4cb83948190bd57bec21d78ed53 completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6c2aadd7081908c6343821e8c655c completed April 21, 2026, 12:19 a.m.
Created at: April 16, 2026, 12:38 p.m.