Triple

T20791539
Position Surface form Disambiguated ID Type / Status
Subject Missouri River corridor E511788 entity
Predicate passesThrough P225 FINISHED
Object Cooper County, Missouri E648131 NE FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Cooper County, Missouri | Statement: [Missouri River corridor, passesThrough, Cooper County, Missouri]

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4cb83948190bd57bec21d78ed53 completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6c2910d488190bc4be37512effc86 completed April 21, 2026, 12:19 a.m.
NED1 Entity disambiguation (via context triple) batch_6a3470267d948190847bfebe74ce3237 completed June 18, 2026, 10:24 p.m.
Created at: April 16, 2026, 12:38 p.m.