Triple

T20790042
Position Surface form Disambiguated ID Type / Status
Subject Salzburg trolleybus network E511748 entity
Predicate instanceOf P0 FINISHED
Object electric bus network C8091 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: electric bus network
Context triple: [Salzburg trolleybus network, instanceOf, electric bus network]
  • A. bus service network
    A bus service network is an interconnected system of bus routes, stops, schedules, and vehicles designed to transport passengers efficiently across a defined geographic area.
  • B. trolleybus line chosen
    A trolleybus line is a designated public transit route served by electrically powered buses that draw current from overhead wires along the roadway.
  • C. bus rapid transit line
    A bus rapid transit line is a high-capacity bus corridor that uses dedicated lanes, priority signaling, and streamlined stations to provide fast, reliable, rail-like transit service.
  • D. rapid transit network
    A rapid transit network is an integrated system of high-capacity, high-frequency urban rail or bus lines designed to move large numbers of passengers quickly and efficiently across a metropolitan area.
  • E. regional bus service
    A regional bus service is a public transportation system that operates scheduled bus routes connecting multiple towns or cities within a specific geographic area.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4cb83948190bd57bec21d78ed53 completed April 16, 2026, 10:07 a.m.
Created at: April 16, 2026, 12:38 p.m.