Triple

T20781839
Position Surface form Disambiguated ID Type / Status
Subject M2 motorway (Hungary) E511500 entity
Predicate roadNumber P1864 FINISHED
Object M2 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: M2 | Statement: [M2 motorway (Hungary), roadNumber, M2]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: M2
Context triple: [M2 motorway (Hungary), roadNumber, M2]
  • A. M2
    M2 is a major British motorway that connects London with the port town of Dover in Kent, serving as an important route to the Channel ports.
  • B. M2
    M2 was the original name of MTV2, a U.S. cable television channel that focused on music videos and youth-oriented programming.
  • C. M2
    M2 is one of the main lines of the Budapest Metro, running east–west across the city and connecting several key transport hubs.
  • D. M2
    M2 is one of the main metro lines in Helsinki’s public transportation system, serving key districts across the city and its surrounding areas.
  • E. M2
    M2 is a major Russian federal highway that connects Moscow with the Crimean Peninsula, serving as a key north–south transport route.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: M2
Target entity description: M2 is a major Hungarian motorway that connects Budapest with the northern regions toward Vác and the Slovakian border.
  • A. M2
    M2 is one of the main lines of the Budapest Metro, running east–west across the city and connecting several key transport hubs.
  • B. M2
    M2 is a major Russian federal highway that connects Moscow with the Crimean Peninsula, serving as a key north–south transport route.
  • C. M2
    M2 is a major motorway in Northern Ireland that forms part of the key route connecting Belfast with the northern part of the country.
  • D. M2
    M2 is a major British motorway that connects London with the port town of Dover in Kent, serving as an important route to the Channel ports.
  • E. M2
    M2 is one of the main lines of the Bucharest Metro, running on a north–south axis and serving several of the city’s key residential and commercial areas.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4cac7a48190a715cb3d545df2b4 completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6c287b5288190823766fe59402d48 completed April 21, 2026, 12:19 a.m.
Created at: April 16, 2026, 12:38 p.m.