Triple

T20768069
Position Surface form Disambiguated ID Type / Status
Subject New Hampshire Route 1A E511151 entity
Predicate hasRouteDesignation P5539 FINISHED
Object NH 1A
NH 1A is a scenic state highway along New Hampshire’s short Atlantic coastline, connecting coastal communities and beaches.
E1450023 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: NH 1A | Statement: [New Hampshire Route 1A, hasRouteDesignation, NH 1A]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: NH 1A
Context triple: [New Hampshire Route 1A, hasRouteDesignation, NH 1A]
  • A. NH 10A
    NH 10A is a short state highway in New Hampshire that serves as a connector route near Hanover and the Vermont state line.
  • B. NH 5
    NH 5 is a major Indian national highway that forms part of the country’s primary road network, connecting key cities and regions.
  • C. NH 101
    NH 101 is a major east–west state highway in New Hampshire that connects the Manchester area with the Seacoast region and other key routes.
  • D. NH19
    NH19 is a major national highway in India that forms part of the historic Grand Trunk Road and connects key cities across northern and eastern India.
  • E. NH 65
    NH 65 is a major National Highway in India that runs east–west, connecting the states of Maharashtra, Karnataka, Telangana, and Andhra Pradesh.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: NH 1A
Triple: [New Hampshire Route 1A, hasRouteDesignation, NH 1A]
Generated description
NH 1A is a scenic state highway along New Hampshire’s short Atlantic coastline, connecting coastal communities and beaches.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: NH 1A
Target entity description: NH 1A is a scenic state highway along New Hampshire’s short Atlantic coastline, connecting coastal communities and beaches.
  • A. NH 10A
    NH 10A is a short state highway in New Hampshire that serves as a connector route near Hanover and the Vermont state line.
  • B. NH 5
    NH 5 is a major Indian national highway that forms part of the country’s primary road network, connecting key cities and regions.
  • C. NH 101
    NH 101 is a major east–west state highway in New Hampshire that connects the Manchester area with the Seacoast region and other key routes.
  • D. NH19
    NH19 is a major national highway in India that forms part of the historic Grand Trunk Road and connects key cities across northern and eastern India.
  • E. NH 65
    NH 65 is a major National Highway in India that runs east–west, connecting the states of Maharashtra, Karnataka, Telangana, and Andhra Pradesh.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4ca01148190ac018e57e0cab46f completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6c24df58c8190b37398353ce4bf24 completed April 21, 2026, 12:18 a.m.
NED1 Entity disambiguation (via context triple) batch_6a08ef8d27dc8190a6ae623f4bbe452e completed May 16, 2026, 10:28 p.m.
NEDg Description generation batch_6a08f28a96488190bf80089105facd0b completed May 16, 2026, 10:41 p.m.
NED2 Entity disambiguation (via description) batch_6a08f316e7988190920ec8eeb56e76a2 completed May 16, 2026, 10:43 p.m.
Created at: April 16, 2026, 12:36 p.m.