Triple

T2073993
Position Surface form Disambiguated ID Type / Status
Subject No. 617 Squadron RAF E44879 entity
Predicate targeted P860 FINISHED
Object Eder Dam E45015 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Eder Dam | Statement: [No. 617 Squadron RAF, targeted, Eder Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Eder Dam
Context triple: [No. 617 Squadron RAF, targeted, Eder Dam]
  • A. Eder Dam chosen
    Eder Dam is a major German gravity dam in the Eder River valley, historically known for being one of the dams breached by the RAF’s “Dambusters” raid during World War II.
  • B. Betania Dam
    Betania Dam is a major hydroelectric dam and reservoir in Colombia, known for generating power and supporting irrigation and aquaculture in the Huila region.
  • C. Sorpe Dam
    The Sorpe Dam is a German earth-fill dam in the Ruhr region that was a key target of the RAF’s World War II “Dambusters” raid, Operation Chastise.
  • D. Almatti Dam
    Almatti Dam is a major hydroelectric and irrigation dam in Karnataka, India, built across the Krishna River as part of the Upper Krishna Project.
  • E. Bargi Dam
    Bargi Dam is a major multipurpose dam built on the Narmada River in Madhya Pradesh, India, primarily used for irrigation, hydropower generation, and flood control.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88916c2b48190a5ca2e9b12cad3ed completed March 4, 2026, 7:33 p.m.
NER Named-entity recognition batch_69abba101c008190840763d2f28fa8d7 completed March 7, 2026, 5:39 a.m.
NED1 Entity disambiguation (via context triple) batch_69ae7eee9bd88190a46e34030939a568 completed March 9, 2026, 8:03 a.m.
Created at: March 4, 2026, 7:41 p.m.