Triple
T20729470
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Echuca railway line |
E509529
|
entity |
| Predicate | railSystem |
P522
|
FINISHED |
| Object | Victorian broad gauge network |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Victorian broad gauge network | Statement: [Echuca railway line, railSystem, Victorian broad gauge network]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Victorian broad gauge network Context triple: [Echuca railway line, railSystem, Victorian broad gauge network]
-
A.
Victorian regional rail network
The Victorian regional rail network is a system of passenger and freight railway lines that connect Melbourne with major regional cities and rural communities across the state of Victoria, Australia.
-
B.
New South Wales Government Railways broad gauge line
The New South Wales Government Railways broad gauge line was a historical railway route in southeastern Australia that connected the New South Wales network to the Victorian system, facilitating interstate passenger and freight transport.
-
C.
Goldfields Railway
Goldfields Railway is a preserved heritage railway in New Zealand that operates vintage trains for tourists and rail enthusiasts along a historic mining-era line.
-
D.
Irish broad gauge
Irish broad gauge is the wider-than-standard railway track gauge historically and predominantly used on railways in Ireland.
-
E.
Eastern Goldfields Railway
The Eastern Goldfields Railway is a major rail line in Western Australia that connects the gold-mining city of Kalgoorlie with Perth and other parts of the state, supporting both passenger and freight transport.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Victorian broad gauge network Target entity description: The Victorian broad gauge network is a historic and extensive 1,600 mm railway system in the Australian state of Victoria that forms the backbone of its regional and suburban rail services.
-
A.
Victorian regional rail network
chosen
The Victorian regional rail network is a system of passenger and freight railway lines that connect Melbourne with major regional cities and rural communities across the state of Victoria, Australia.
-
B.
New South Wales Government Railways broad gauge line
The New South Wales Government Railways broad gauge line was a historical railway route in southeastern Australia that connected the New South Wales network to the Victorian system, facilitating interstate passenger and freight transport.
-
C.
Goldfields Railway
Goldfields Railway is a preserved heritage railway in New Zealand that operates vintage trains for tourists and rail enthusiasts along a historic mining-era line.
-
D.
Irish broad gauge
Irish broad gauge is the wider-than-standard railway track gauge historically and predominantly used on railways in Ireland.
-
E.
Eastern Goldfields Railway
The Eastern Goldfields Railway is a major rail line in Western Australia that connects the gold-mining city of Kalgoorlie with Perth and other parts of the state, supporting both passenger and freight transport.
- F. None of above.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4c589c08190834fb5d86d0efa2b |
completed | April 16, 2026, 10:07 a.m. |
| NER | Named-entity recognition | batch_69e6c1eb5d44819082d9fa410e676d91 |
completed | April 21, 2026, 12:16 a.m. |
Created at: April 16, 2026, 12:30 p.m.