Triple

T20723764
Position Surface form Disambiguated ID Type / Status
Subject Curtis L. Brown Jr. E509382 entity
Predicate spaceMission P68 FINISHED
Object STS-85 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-85 | Statement: [Curtis L. Brown Jr., spaceMission, STS-85]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-85
Context triple: [Curtis L. Brown Jr., spaceMission, STS-85]
  • A. STS-85 chosen
    STS-85 was a 1997 Space Shuttle Discovery mission focused on scientific research and technology demonstrations in low Earth orbit.
  • B. STS-86
    STS-86 was a 1997 NASA Space Shuttle mission that conducted a docking with the Russian Mir space station as part of the Shuttle–Mir program.
  • C. STS-89
    STS-89 was a NASA Space Shuttle mission to the Russian Mir space station that conducted crew transfer and scientific research as part of the Shuttle–Mir program.
  • D. STS-87
    STS-87 was a 1997 NASA Space Shuttle Columbia mission focused on microgravity and solar physics experiments, notable for including astronaut Kalpana Chawla among its crew.
  • E. STS-80
    STS-80 was a 1996 Space Shuttle Columbia mission focused on deploying and retrieving scientific satellites and conducting microgravity research in Earth orbit.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4c4cc648190b45fda6e2b20af56 completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6c1e59b2081909fb6c29cb5018bb4 completed April 21, 2026, 12:16 a.m.
Created at: April 16, 2026, 12:28 p.m.