Triple

T2068937
Position Surface form Disambiguated ID Type / Status
Subject Provisional Government of the French Republic E45970 entity
Predicate instanceOf P0 FINISHED
Object post-war government C415 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: post-war government
Context triple: [Provisional Government of the French Republic, instanceOf, post-war government]
  • A. postwar occupation
    Postwar occupation is the temporary control and administration of a defeated state’s territory by foreign military or allied authorities to manage security, political transition, and reconstruction after armed conflict.
  • B. post–World War II reconstruction program
    A post–World War II reconstruction program is a coordinated set of policies, financial aid, and institutional reforms designed to rebuild war-torn economies, infrastructure, and governance structures while promoting long-term stability and growth.
  • C. national government chosen
    A national government is the central authority of a sovereign state responsible for creating and enforcing laws, managing public policy, and representing the nation domestically and internationally.
  • D. wartime settlement
    A wartime settlement is an agreement or arrangement reached during or immediately after armed conflict that defines the terms for ending hostilities, addressing territorial or political disputes, and establishing conditions for postwar order.
  • E. political restoration
    Political restoration is the process of reestablishing a previous political system, regime, or balance of power after a period of disruption, revolution, or reform.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8891b38288190abd572ccad9b6928 completed March 4, 2026, 7:33 p.m.
Created at: March 4, 2026, 7:41 p.m.