Triple

T20676801
Position Surface form Disambiguated ID Type / Status
Subject Asian Paralympic Committee E508179 entity
Predicate instanceOf P0 FINISHED
Object continental paralympic committee C43422 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: continental paralympic committee
Context triple: [Asian Paralympic Committee, instanceOf, continental paralympic committee]
  • A. national Paralympic committee
    A national Paralympic committee is an official organization within a country responsible for developing, selecting, and managing athletes and teams to represent that nation in Paralympic sports and competitions.
  • B. Winter Paralympic Games
    The Winter Paralympic Games are an international multi-sport event held every four years, featuring winter sports competitions for athletes with physical, visual, and intellectual impairments, organized in parallel with the Olympic Winter Games.
  • C. Paralympic Games
    The Paralympic Games are a major international multi-sport event where athletes with a range of physical, visual, and intellectual impairments compete at the elite level, typically held shortly after and in the same host city as the Olympic Games.
  • D. Paralympic athlete
    A Paralympic athlete is a sportsperson with a physical, visual, or intellectual impairment who trains and competes at an elite level under the classification and rules of the Paralympic movement.
  • E. Parapan American Games
    The Parapan American Games are a major multi-sport event held every four years for athletes with disabilities from countries across the Americas, organized in parallel with the Pan American Games.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4c1164881909a3bf1e3ddb2bc32 completed April 16, 2026, 10:06 a.m.
Created at: April 16, 2026, 11:44 a.m.