Triple

T2057789
Position Surface form Disambiguated ID Type / Status
Subject Sorpe Dam E45716 entity
Predicate instanceOf P0 FINISHED
Object earth-fill dam C5438 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: earth-fill dam
Context triple: [Sorpe Dam, instanceOf, earth-fill dam]
  • A. concrete dam
    A concrete dam is a massive engineered barrier constructed primarily from concrete to hold back and control the flow of water in a river or reservoir.
  • B. concrete gravity dam
    A concrete gravity dam is a massive structure made of concrete that resists the horizontal thrust of water primarily through its own weight and the force of gravity.
  • C. arch-gravity dam
    An arch-gravity dam is a concrete dam that combines the curved, arch action of an arch dam with the mass and weight-based stability of a gravity dam to resist water pressure.
  • D. masonry gravity dam
    A masonry gravity dam is a massive structure built from stone or brick masonry whose own weight resists the horizontal pressure of the water it retains.
  • E. earthwork chosen
    An earthwork is a large-scale construction or artistic formation made by shaping, moving, or arranging soil, rock, and other natural materials in the landscape.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8891a19508190a12ef1e192308dcb completed March 4, 2026, 7:33 p.m.
Created at: March 4, 2026, 7:40 p.m.