Triple

T20574257
Position Surface form Disambiguated ID Type / Status
Subject Washington State Route 543 E505172 entity
Predicate abbreviation P43 FINISHED
Object SR 543
SR 543 is a short Washington state highway in Blaine that connects Interstate 5 to the Canada–US border, serving as a key freight and border-crossing route.
E1438800 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: SR 543 | Statement: [Washington State Route 543, abbreviation, SR 543]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: SR 543
Context triple: [Washington State Route 543, abbreviation, SR 543]
  • A. SR 53
    SR 53 is a state highway designation used for numbered routes in various U.S. states.
  • B. SR 54
    SR 54 is a state highway in Georgia that connects several communities in the western part of the state, including areas around Atlanta.
  • C. SR 342
    SR 342 is a Nevada state highway that serves as a scenic connector through the historic Comstock mining region, including the town of Virginia City.
  • D. SR 341
    SR 341 is a Nevada state highway that connects U.S. Route 50 near Dayton to the historic mining town of Virginia City through the Virginia Range.
  • E. SR 35
    SR 35 is a Tennessee state highway that serves as a primary north–south transportation route connecting several communities in the eastern part of the state.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: SR 543
Triple: [Washington State Route 543, abbreviation, SR 543]
Generated description
SR 543 is a short Washington state highway in Blaine that connects Interstate 5 to the Canada–US border, serving as a key freight and border-crossing route.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: SR 543
Target entity description: SR 543 is a short Washington state highway in Blaine that connects Interstate 5 to the Canada–US border, serving as a key freight and border-crossing route.
  • A. SR 53
    SR 53 is a state highway designation used for numbered routes in various U.S. states.
  • B. SR 54
    SR 54 is a state highway in Georgia that connects several communities in the western part of the state, including areas around Atlanta.
  • C. SR 342
    SR 342 is a Nevada state highway that serves as a scenic connector through the historic Comstock mining region, including the town of Virginia City.
  • D. SR 341
    SR 341 is a Nevada state highway that connects U.S. Route 50 near Dayton to the historic mining town of Virginia City through the Virginia Range.
  • E. SR 35
    SR 35 is a Tennessee state highway that serves as a primary north–south transportation route connecting several communities in the eastern part of the state.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4b721588190993ac7b0a9be2736 completed April 16, 2026, 10:06 a.m.
NER Named-entity recognition batch_69e6a9087af88190a4610ecb29f637ca completed April 20, 2026, 10:30 p.m.
NED1 Entity disambiguation (via context triple) batch_6a08ace6329c81909a96ee9fbaa69ce9 completed May 16, 2026, 5:44 p.m.
NEDg Description generation batch_6a08ae7ed45881909b94f034e7db8c9d completed May 16, 2026, 5:50 p.m.
NED2 Entity disambiguation (via description) batch_6a08aefec80c8190b2ffc172dd6c3e42 completed May 16, 2026, 5:53 p.m.
Created at: April 16, 2026, 11:39 a.m.