Triple

T20552152
Position Surface form Disambiguated ID Type / Status
Subject Peace Canyon Dam E504621 entity
Predicate hasPowerPlant P9904 FINISHED
Object Peace Canyon Generating Station NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Peace Canyon Generating Station | Statement: [Peace Canyon Dam, hasPowerPlant, Peace Canyon Generating Station]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Peace Canyon Generating Station
Context triple: [Peace Canyon Dam, hasPowerPlant, Peace Canyon Generating Station]
  • A. Big Bend Power Station
    Big Bend Power Station is a large coal-fired power plant in Apollo Beach, Florida, known for supplying electricity to the Tampa Bay area and for its nearby manatee viewing center.
  • B. Devil Canyon Powerplant
    Devil Canyon Powerplant is a hydroelectric generating facility in Southern California that produces power as part of the State Water Project’s water conveyance and energy system.
  • C. Leaburg Power Plant
    Leaburg Power Plant is a hydroelectric generating facility on the McKenzie River in Oregon, known for producing renewable electricity as part of the Leaburg Dam complex.
  • D. Moccasin Low-Head Generating Plant
    The Moccasin Low-Head Generating Plant is a hydroelectric power facility in California that forms part of the Hetch Hetchy system supplying electricity to the San Francisco Bay Area.
  • E. Fort Peck Power Plant
    Fort Peck Power Plant is a hydroelectric generating facility in Montana that converts water released from Fort Peck Dam into electrical power for the surrounding region.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Peace Canyon Generating Station
Target entity description: Peace Canyon Generating Station is a hydroelectric power facility on the Peace River in British Columbia, Canada, that generates electricity using water impounded by the Peace Canyon Dam.
  • A. Big Bend Power Station
    Big Bend Power Station is a large coal-fired power plant in Apollo Beach, Florida, known for supplying electricity to the Tampa Bay area and for its nearby manatee viewing center.
  • B. Devil Canyon Powerplant
    Devil Canyon Powerplant is a hydroelectric generating facility in Southern California that produces power as part of the State Water Project’s water conveyance and energy system.
  • C. Leaburg Power Plant
    Leaburg Power Plant is a hydroelectric generating facility on the McKenzie River in Oregon, known for producing renewable electricity as part of the Leaburg Dam complex.
  • D. Moccasin Low-Head Generating Plant
    The Moccasin Low-Head Generating Plant is a hydroelectric power facility in California that forms part of the Hetch Hetchy system supplying electricity to the San Francisco Bay Area.
  • E. Fort Peck Power Plant
    Fort Peck Power Plant is a hydroelectric generating facility in Montana that converts water released from Fort Peck Dam into electrical power for the surrounding region.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4b52c048190952b4d0f430813a3 completed April 16, 2026, 10:06 a.m.
NER Named-entity recognition batch_69e6a5d98c348190ac516bc2df59d878 completed April 20, 2026, 10:16 p.m.
Created at: April 16, 2026, 11:38 a.m.