Triple

T20540191
Position Surface form Disambiguated ID Type / Status
Subject Herrington Lake E504305 entity
Predicate hasNearbyInfrastructure P231 FINISHED
Object Dix Dam Hydroelectric Station NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Dix Dam Hydroelectric Station | Statement: [Herrington Lake, hasNearbyInfrastructure, Dix Dam Hydroelectric Station]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Dix Dam Hydroelectric Station
Context triple: [Herrington Lake, hasNearbyInfrastructure, Dix Dam Hydroelectric Station]
  • A. Pullinque Hydroelectric Plant
    Pullinque Hydroelectric Plant is a hydroelectric power facility in southern Chile that generates electricity using water resources associated with Pullinque Lake.
  • B. Denison Dam Power Plant
    Denison Dam Power Plant is a hydroelectric generating facility located at Denison Dam on the Red River, producing renewable electricity from the dam’s reservoir outflows.
  • C. Barron Gorge Hydroelectric Power Station
    Barron Gorge Hydroelectric Power Station is a historic hydroelectric facility in Queensland, Australia, that harnesses the Barron River’s flow through Barron Gorge to generate renewable electricity.
  • D. Moses–Saunders Power Dam
    The Moses–Saunders Power Dam is a large binational hydroelectric generating station on the Saint Lawrence River jointly operated by the United States and Canada.
  • E. Stevenson Dam Hydroelectric Plant
    Stevenson Dam Hydroelectric Plant is a hydroelectric power station in Connecticut that generates electricity using water impounded by the Stevenson Dam on the Housatonic River.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Dix Dam Hydroelectric Station
Target entity description: Dix Dam Hydroelectric Station is a hydroelectric power facility in Kentucky that generates electricity using water impounded by Dix Dam on Herrington Lake.
  • A. Pullinque Hydroelectric Plant
    Pullinque Hydroelectric Plant is a hydroelectric power facility in southern Chile that generates electricity using water resources associated with Pullinque Lake.
  • B. Denison Dam Power Plant
    Denison Dam Power Plant is a hydroelectric generating facility located at Denison Dam on the Red River, producing renewable electricity from the dam’s reservoir outflows.
  • C. Barron Gorge Hydroelectric Power Station
    Barron Gorge Hydroelectric Power Station is a historic hydroelectric facility in Queensland, Australia, that harnesses the Barron River’s flow through Barron Gorge to generate renewable electricity.
  • D. Moses–Saunders Power Dam
    The Moses–Saunders Power Dam is a large binational hydroelectric generating station on the Saint Lawrence River jointly operated by the United States and Canada.
  • E. Stevenson Dam Hydroelectric Plant
    Stevenson Dam Hydroelectric Plant is a hydroelectric power station in Connecticut that generates electricity using water impounded by the Stevenson Dam on the Housatonic River.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4b476648190bc6019622ae54d3c completed April 16, 2026, 10:06 a.m.
NER Named-entity recognition batch_69e6a29224f081908298d104161c5bb9 completed April 20, 2026, 10:02 p.m.
Created at: April 16, 2026, 11:37 a.m.