Triple
T20540191
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Herrington Lake |
E504305
|
entity |
| Predicate | hasNearbyInfrastructure |
P231
|
FINISHED |
| Object | Dix Dam Hydroelectric Station |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Dix Dam Hydroelectric Station | Statement: [Herrington Lake, hasNearbyInfrastructure, Dix Dam Hydroelectric Station]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Dix Dam Hydroelectric Station Context triple: [Herrington Lake, hasNearbyInfrastructure, Dix Dam Hydroelectric Station]
-
A.
Pullinque Hydroelectric Plant
Pullinque Hydroelectric Plant is a hydroelectric power facility in southern Chile that generates electricity using water resources associated with Pullinque Lake.
-
B.
Denison Dam Power Plant
Denison Dam Power Plant is a hydroelectric generating facility located at Denison Dam on the Red River, producing renewable electricity from the dam’s reservoir outflows.
-
C.
Barron Gorge Hydroelectric Power Station
Barron Gorge Hydroelectric Power Station is a historic hydroelectric facility in Queensland, Australia, that harnesses the Barron River’s flow through Barron Gorge to generate renewable electricity.
-
D.
Moses–Saunders Power Dam
The Moses–Saunders Power Dam is a large binational hydroelectric generating station on the Saint Lawrence River jointly operated by the United States and Canada.
-
E.
Stevenson Dam Hydroelectric Plant
Stevenson Dam Hydroelectric Plant is a hydroelectric power station in Connecticut that generates electricity using water impounded by the Stevenson Dam on the Housatonic River.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Dix Dam Hydroelectric Station Target entity description: Dix Dam Hydroelectric Station is a hydroelectric power facility in Kentucky that generates electricity using water impounded by Dix Dam on Herrington Lake.
-
A.
Pullinque Hydroelectric Plant
Pullinque Hydroelectric Plant is a hydroelectric power facility in southern Chile that generates electricity using water resources associated with Pullinque Lake.
-
B.
Denison Dam Power Plant
Denison Dam Power Plant is a hydroelectric generating facility located at Denison Dam on the Red River, producing renewable electricity from the dam’s reservoir outflows.
-
C.
Barron Gorge Hydroelectric Power Station
Barron Gorge Hydroelectric Power Station is a historic hydroelectric facility in Queensland, Australia, that harnesses the Barron River’s flow through Barron Gorge to generate renewable electricity.
-
D.
Moses–Saunders Power Dam
The Moses–Saunders Power Dam is a large binational hydroelectric generating station on the Saint Lawrence River jointly operated by the United States and Canada.
-
E.
Stevenson Dam Hydroelectric Plant
Stevenson Dam Hydroelectric Plant is a hydroelectric power station in Connecticut that generates electricity using water impounded by the Stevenson Dam on the Housatonic River.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4b476648190bc6019622ae54d3c |
completed | April 16, 2026, 10:06 a.m. |
| NER | Named-entity recognition | batch_69e6a29224f081908298d104161c5bb9 |
completed | April 20, 2026, 10:02 p.m. |
Created at: April 16, 2026, 11:37 a.m.