Triple

T20523626
Position Surface form Disambiguated ID Type / Status
Subject IEC Conformity Assessment Board E503875 entity
Predicate instanceOf P0 FINISHED
Object conformity assessment board C43728 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: conformity assessment board
Context triple: [IEC Conformity Assessment Board, instanceOf, conformity assessment board]
  • A. conformity assessment scheme
    A conformity assessment scheme is a structured, predefined set of rules, procedures, and criteria used to systematically evaluate and determine whether products, services, systems, or persons meet specified standards or regulatory requirements.
  • B. certification body
    A certification body is an independent organization that assesses and verifies whether products, services, systems, or individuals meet specified standards or requirements, and issues formal certificates to confirm compliance.
  • C. IEC Conformity Assessment System
    The IEC Conformity Assessment System is a structured framework of international schemes and procedures used to evaluate and certify that electrical, electronic, and related technologies comply with IEC standards.
  • D. quality assurance agency
    A quality assurance agency is an organization responsible for systematically evaluating, monitoring, and improving the standards, processes, and outcomes of institutions, products, or services to ensure they meet defined quality criteria and regulatory requirements.
  • E. examination board
    An examination board is a formal group of qualified individuals responsible for designing, administering, and evaluating assessments to ensure fair and consistent measurement of candidates’ knowledge or skills.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4b3a6e08190ae663701f50fab8e completed April 16, 2026, 10:06 a.m.
Created at: April 16, 2026, 11:36 a.m.