Triple

T20522313
Position Surface form Disambiguated ID Type / Status
Subject Expedition 15 to Expedition 16 E503840 entity
Predicate instanceOf P0 FINISHED
Object International Space Station crew transition C26752 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: International Space Station crew transition
Context triple: [Expedition 15 to Expedition 16, instanceOf, International Space Station crew transition]
  • A. International Space Station expedition chosen
    An International Space Station expedition is a long-duration mission during which a designated crew lives and works aboard the ISS to conduct scientific research, perform maintenance, and support ongoing space operations.
  • B. crewed space station
    A crewed space station is a permanently or semi-permanently inhabited orbital facility that supports human life and scientific, technological, or operational activities in space.
  • C. Space Shuttle mission
    A Space Shuttle mission is a coordinated spaceflight operation using the Space Shuttle orbiter to transport crew, cargo, and conduct scientific or technical objectives in Earth orbit and beyond.
  • D. orbital space station
    An orbital space station is a large, habitable artificial structure that continuously orbits a celestial body, serving as a long-term platform for human presence, research, and operations in space.
  • E. spacewalker
    A spacewalker is an individual who exits a spacecraft to perform tasks or exploration in the vacuum of space, typically wearing a specialized suit for life support and protection.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4b3a6e08190ae663701f50fab8e completed April 16, 2026, 10:06 a.m.
Created at: April 16, 2026, 11:36 a.m.