Triple

T20513749
Position Surface form Disambiguated ID Type / Status
Subject North Carolina Bicycle Route System E503631 entity
Predicate hasComponent P35 FINISHED
Object North Carolina Bicycle Route 3 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: North Carolina Bicycle Route 3 | Statement: [North Carolina Bicycle Route System, hasComponent, North Carolina Bicycle Route 3]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: North Carolina Bicycle Route 3
Context triple: [North Carolina Bicycle Route System, hasComponent, North Carolina Bicycle Route 3]
  • A. North Carolina Bicycle Route 2
    North Carolina Bicycle Route 2 is a designated long-distance cycling route that spans the state of North Carolina, providing a signed and mapped corridor for touring cyclists.
  • B. North Carolina Bicycle Route 1
    North Carolina Bicycle Route 1 is a designated long-distance cycling route that runs north–south across North Carolina, connecting multiple regions and communities via signed, bike-friendly roads.
  • C. North Carolina Bicycle Route System
    The North Carolina Bicycle Route System is a statewide network of designated long-distance cycling routes that provide signed, interconnected corridors for bicycle travel across North Carolina.
  • D. North Carolina Highway 211
    North Carolina Highway 211 is a primary state highway in North Carolina that runs across the south-central and southeastern part of the state, connecting inland communities with coastal areas.
  • E. North Carolina Highway 345
    North Carolina Highway 345 is a state highway on Roanoke Island in North Carolina that serves as a local connector route between the island’s communities and nearby major roads.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: North Carolina Bicycle Route 3
Target entity description: North Carolina Bicycle Route 3 is a designated long-distance cycling route that runs along part of North Carolina’s coast, connecting various communities and scenic areas as part of the state’s official bicycle route network.
  • A. North Carolina Bicycle Route 2
    North Carolina Bicycle Route 2 is a designated long-distance cycling route that spans the state of North Carolina, providing a signed and mapped corridor for touring cyclists.
  • B. North Carolina Bicycle Route 1
    North Carolina Bicycle Route 1 is a designated long-distance cycling route that runs north–south across North Carolina, connecting multiple regions and communities via signed, bike-friendly roads.
  • C. North Carolina Bicycle Route System
    The North Carolina Bicycle Route System is a statewide network of designated long-distance cycling routes that provide signed, interconnected corridors for bicycle travel across North Carolina.
  • D. North Carolina Highway 211
    North Carolina Highway 211 is a primary state highway in North Carolina that runs across the south-central and southeastern part of the state, connecting inland communities with coastal areas.
  • E. North Carolina Highway 345
    North Carolina Highway 345 is a state highway on Roanoke Island in North Carolina that serves as a local connector route between the island’s communities and nearby major roads.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4b2aa788190ae9eb37c1d73b1f1 completed April 16, 2026, 10:06 a.m.
NER Named-entity recognition batch_69e69f4066908190a94724697fb8cdcb completed April 20, 2026, 9:48 p.m.
Created at: April 16, 2026, 11:36 a.m.