Triple

T2048926
Position Surface form Disambiguated ID Type / Status
Subject Chatham Docks E45518 entity
Predicate instanceOf P0 FINISHED
Object dockyard C452 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: dockyard
Context triple: [Chatham Docks, instanceOf, dockyard]
  • A. harbor
    A harbor is a sheltered body of water, often equipped with docks and facilities, where ships can anchor safely for loading, unloading, and protection from rough seas.
  • B. sea stack
    A sea stack is a steep, often vertical column of rock near a coast, formed by wave erosion isolating part of a headland from the mainland.
  • C. canal wharf
    A canal wharf is a designated waterside area along a canal where boats can moor to load and unload cargo or passengers.
  • D. seaport chosen
    A seaport is a coastal facility equipped with harbors, docks, and infrastructure to enable the loading, unloading, storage, and transfer of cargo and passengers between sea and land transportation.
  • E. cobbler
    A cobbler is a skilled craftsperson who repairs, maintains, and sometimes makes shoes and other leather footwear.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8891948208190ab7898da21824c77 completed March 4, 2026, 7:33 p.m.
Created at: March 4, 2026, 7:39 p.m.