Triple
T2048926
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Chatham Docks |
E45518
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | dockyard |
C452
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: dockyard Context triple: [Chatham Docks, instanceOf, dockyard]
-
A.
harbor
A harbor is a sheltered body of water, often equipped with docks and facilities, where ships can anchor safely for loading, unloading, and protection from rough seas.
-
B.
sea stack
A sea stack is a steep, often vertical column of rock near a coast, formed by wave erosion isolating part of a headland from the mainland.
-
C.
canal wharf
A canal wharf is a designated waterside area along a canal where boats can moor to load and unload cargo or passengers.
-
D.
seaport
chosen
A seaport is a coastal facility equipped with harbors, docks, and infrastructure to enable the loading, unloading, storage, and transfer of cargo and passengers between sea and land transportation.
-
E.
cobbler
A cobbler is a skilled craftsperson who repairs, maintains, and sometimes makes shoes and other leather footwear.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a8891948208190ab7898da21824c77 |
completed | March 4, 2026, 7:33 p.m. |
Created at: March 4, 2026, 7:39 p.m.