Triple
T2046322
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | North Hoyle Offshore Wind Farm |
E45460
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | wind power plant |
C9379
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: wind power plant Context triple: [North Hoyle Offshore Wind Farm, instanceOf, wind power plant]
-
A.
windmill
A windmill is a structure that converts the kinetic energy of wind into mechanical energy, traditionally used for tasks such as grinding grain, pumping water, or generating electricity.
-
B.
water-powered mill
A water-powered mill is a structure that uses the energy of flowing or falling water, typically via a waterwheel or turbine, to drive mechanical processes such as grinding grain, sawing wood, or generating power.
-
C.
industrial plant
An industrial plant is a large-scale facility where raw materials are transformed through mechanical, chemical, or biological processes into finished or semi-finished products using specialized equipment and coordinated operations.
-
D.
manufacturing plant
A manufacturing plant is a large-scale industrial facility where raw materials are transformed through organized processes, machinery, and labor into finished goods or components.
-
E.
Dutch windmill
A Dutch windmill is a traditional tower-like structure with large rotating sails used historically in the Netherlands to harness wind power for milling grain, pumping water, and other mechanical tasks.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a8891948208190ab7898da21824c77 |
completed | March 4, 2026, 7:33 p.m. |
Created at: March 4, 2026, 7:39 p.m.