Triple
T20459946
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Crossing of the Danube (1877) |
E501897
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | river crossing operation |
C43558
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: river crossing operation Context triple: [Crossing of the Danube (1877), instanceOf, river crossing operation]
-
A.
river crossing
A river crossing is a location or method by which people, animals, or vehicles traverse from one side of a river to the other, using natural shallows, bridges, ferries, or other means.
-
B.
bridge-crossing challenge
A bridge-crossing challenge is a scenario or puzzle in which participants must determine how to move individuals or items across a bridge under specific constraints such as time limits, capacity restrictions, or safety rules.
-
C.
разводной мост
Разводной мост — это мостовая конструкция с подвижными пролетами, которые могут подниматься или раздвигаться для пропуска судов по водному пути.
-
D.
river bridge
A river bridge is a structure built to span a river, providing a stable pathway for vehicles, pedestrians, or rail traffic to cross from one bank to the other.
-
E.
movable bridge
A movable bridge is a type of bridge with a deck or section that can be mechanically raised, lowered, rotated, or otherwise repositioned to allow the passage of water or land traffic beneath or through it.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4ad4940819098cf2ff6413574e5 |
completed | April 16, 2026, 10:06 a.m. |
Created at: April 16, 2026, 11:33 a.m.