Triple

T20456348
Position Surface form Disambiguated ID Type / Status
Subject Theodore, Alabama E501797 entity
Predicate servedByHighway P385 FINISHED
Object Alabama State Route 193 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Alabama State Route 193 | Statement: [Theodore, Alabama, servedByHighway, Alabama State Route 193]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Alabama State Route 193
Context triple: [Theodore, Alabama, servedByHighway, Alabama State Route 193]
  • A. Alabama State Route 191
    Alabama State Route 191 is a state highway in Alabama that serves as a local connector route within Chilton County.
  • B. Alabama State Route 199
    Alabama State Route 199 is a state highway in Alabama that serves as a regional connector route within Macon County and its surrounding area.
  • C. Alabama State Route 189
    Alabama State Route 189 is a state highway in Alabama that serves as a regional connector route within the state's transportation network.
  • D. Alabama State Route 183
    Alabama State Route 183 is a state highway in Alabama that serves as a regional connector route, running through rural areas including parts of Chilton County.
  • E. Alabama State Route 119
    Alabama State Route 119 is a state highway in Alabama that runs through suburban communities south of Birmingham, serving as a key connector between residential areas, local schools, and major routes like U.S. Highway 280 and Interstate 65.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Alabama State Route 193
Target entity description: Alabama State Route 193 is a state highway in Mobile County that connects the Theodore area to Dauphin Island and other nearby coastal communities.
  • A. Alabama State Route 191
    Alabama State Route 191 is a state highway in Alabama that serves as a local connector route within Chilton County.
  • B. Alabama State Route 199
    Alabama State Route 199 is a state highway in Alabama that serves as a regional connector route within Macon County and its surrounding area.
  • C. Alabama State Route 189
    Alabama State Route 189 is a state highway in Alabama that serves as a regional connector route within the state's transportation network.
  • D. Alabama State Route 183
    Alabama State Route 183 is a state highway in Alabama that serves as a regional connector route, running through rural areas including parts of Chilton County.
  • E. Alabama State Route 119
    Alabama State Route 119 is a state highway in Alabama that runs through suburban communities south of Birmingham, serving as a key connector between residential areas, local schools, and major routes like U.S. Highway 280 and Interstate 65.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4ad4940819098cf2ff6413574e5 completed April 16, 2026, 10:06 a.m.
NER Named-entity recognition batch_69e696a1b03c8190984d9db6d3251308 completed April 20, 2026, 9:12 p.m.
Created at: April 16, 2026, 11:32 a.m.