Triple
T20364869
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Rivergate Tower |
E496881
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | cylindrical building |
C34506
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: cylindrical building Context triple: [Rivergate Tower, instanceOf, cylindrical building]
-
A.
circular building
chosen
A circular building is a structure whose primary floor plan and external footprint form a continuous, rounded shape, typically designed to optimize spatial flow, aesthetics, or environmental performance.
-
B.
crescent-shaped building
A crescent-shaped building is a structure whose overall plan curves in an arc or semi-circle, resembling a crescent moon, often enclosing or partially surrounding an open space.
-
C.
building
A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
-
D.
floor of a building
A floor of a building is a horizontal structural level designed to support occupants and activities, typically bounded vertically by ceilings and/or other floors.
-
E.
circular library building
A circular library building is a round, centrally organized structure designed to house collections and reading spaces in a continuous, flowing layout around a central core or atrium.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4a4f9b081908a5a021919c21ccb |
completed | April 16, 2026, 10:06 a.m. |
Created at: April 16, 2026, 11:26 a.m.