Triple

T20359557
Position Surface form Disambiguated ID Type / Status
Subject Slatina, Romania E496740 entity
Predicate crossedBy P416 FINISHED
Object European route E574 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: European route E574 | Statement: [Slatina, Romania, crossedBy, European route E574]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: European route E574
Context triple: [Slatina, Romania, crossedBy, European route E574]
  • A. European route E574 chosen
    European route E574 is a European B-class road in Romania that connects the cities of Bacău and Brașov, forming part of the international E-road network.
  • B. European route E54
    European route E54 is an international road in the E-road network that connects cities in France and Germany, facilitating cross-border transport and trade.
  • C. European route E52
    European route E52 is an international road in the E-road network that connects Strasbourg in France with Salzburg in Austria via southern Germany.
  • D. European route E74
    European route E74 is an international road in the E-road network that connects parts of France and Italy, linking the French Riviera to northern Italy through key Alpine crossings.
  • E. European route E48
    European route E48 is an international E-road in Central Europe that connects major cities in Germany and the Czech Republic as part of the trans-European road network.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4a3f7f48190b37f354574028ca6 completed April 16, 2026, 10:06 a.m.
NER Named-entity recognition batch_69e678573fc481908bf257e6ed41d750 completed April 20, 2026, 7:02 p.m.
Created at: April 16, 2026, 11:25 a.m.