Triple

T20339617
Position Surface form Disambiguated ID Type / Status
Subject נחל שורק E495704 entity
Predicate instanceOf P0 FINISHED
Object אתר גאוגרפי בישראל C43667 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: אתר גאוגרפי בישראל
Context triple: [נחל שורק, instanceOf, אתר גאוגרפי בישראל]
  • A. populated place in Israel
    A populated place in Israel is a geographically defined area within the State of Israel where people live, such as a city, town, village, kibbutz, or moshav, recognized for administrative, residential, or communal purposes.
  • B. Hebrew-language website
    A Hebrew-language website is an online site whose primary content, navigation, and user interface are presented in Hebrew to serve Hebrew-speaking users.
  • C. map
    A map is a conceptual class that represents a collection of key-value pairs, enabling efficient storage, retrieval, and association of data elements by unique keys.
  • D. geographical work
    A geographical work is a creative or scholarly resource that represents, analyzes, or describes the Earth's surface, places, spatial relationships, or geographic phenomena.
  • E. administrative district of Israel
    An administrative district of Israel is a primary territorial division used by the Israeli government to organize local governance, public administration, and the delivery of state services.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4a1a09881908d97270d6971a25a completed April 16, 2026, 10:06 a.m.
Created at: April 16, 2026, 11:23 a.m.