Triple

T2033547
Position Surface form Disambiguated ID Type / Status
Subject Upkeep bouncing bomb E44570 entity
Predicate primaryTarget P815 FINISHED
Object Sorpe Dam E45716 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Sorpe Dam | Statement: [Upkeep bouncing bomb, primaryTarget, Sorpe Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Sorpe Dam
Context triple: [Upkeep bouncing bomb, primaryTarget, Sorpe Dam]
  • A. Sorpe Dam chosen
    The Sorpe Dam is a German earth-fill dam in the Ruhr region that was a key target of the RAF’s World War II “Dambusters” raid, Operation Chastise.
  • B. Eder Dam
    Eder Dam is a major German gravity dam in the Eder River valley, historically known for being one of the dams breached by the RAF’s “Dambusters” raid during World War II.
  • C. Möhne Dam
    Möhne Dam is a major German gravity dam in North Rhine-Westphalia, historically known for being breached by the RAF’s “Dambusters” raid during World War II.
  • D. Serre-Ponçon Dam
    Serre-Ponçon Dam is a large hydroelectric and irrigation dam in southeastern France that creates one of Western Europe’s biggest artificial lakes.
  • E. Dubăsari Dam
    Dubăsari Dam is a hydroelectric dam and reservoir complex on the Dniester River in Moldova, used for power generation, irrigation, and water regulation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a889144f2481909932f0746a93023d completed March 4, 2026, 7:33 p.m.
NER Named-entity recognition batch_69abb93255248190bd47a54a7b3c7447 completed March 7, 2026, 5:35 a.m.
NED1 Entity disambiguation (via context triple) batch_69ae58bffa30819099409ff59f844a9c completed March 9, 2026, 5:21 a.m.
Created at: March 4, 2026, 7:39 p.m.