Triple

T2033472
Position Surface form Disambiguated ID Type / Status
Subject Unternehmen Seelöwe E44568 entity
Predicate plannedStartCondition P29885 FINISHED
Object achievement of air superiority by the Luftwaffe LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: achievement of air superiority by the Luftwaffe | Statement: [Unternehmen Seelöwe, plannedStartCondition, achievement of air superiority by the Luftwaffe]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: plannedStartCondition
Context triple: [Unternehmen Seelöwe, plannedStartCondition, achievement of air superiority by the Luftwaffe]
  • A. plannedAt
    Indicates that an event, action, or activity is scheduled or intended to occur at a specific time or date.
  • B. datePlanned
    Indicates that a specific date has been scheduled or intended for a particular event, action, or relationship to occur.
  • C. plannedUnder
    Indicates that one entity has been scheduled, organized, or arranged to occur within the scope, authority, or framework of another entity.
  • D. triggerCondition chosen
    Indicates the specific circumstances or state under which an associated event, action, or process is initiated or activated.
  • E. hasPlanningStatus
    Indicates that an entity is associated with a particular stage, condition, or outcome in a planning or approval process.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a889144f2481909932f0746a93023d completed March 4, 2026, 7:33 p.m.
NER Named-entity recognition batch_69abb93255248190bd47a54a7b3c7447 completed March 7, 2026, 5:35 a.m.
PD Predicate disambiguation batch_69abb7a8125881909c0cb58b777c1faa completed March 7, 2026, 5:29 a.m.
Created at: March 4, 2026, 7:39 p.m.