Triple

T20332392
Position Surface form Disambiguated ID Type / Status
Subject Argeș River E492516 entity
Predicate hasDam P8736 FINISHED
Object Vidraru Dam NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Vidraru Dam | Statement: [Argeș River, hasDam, Vidraru Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Vidraru Dam
Context triple: [Argeș River, hasDam, Vidraru Dam]
  • A. Vidraru Dam chosen
    Vidraru Dam is a major hydroelectric dam on the Argeș River in Romania, known for its impressive arch design and scenic location in the Făgăraș Mountains.
  • B. Peligre Dam
    Peligre Dam is a major hydroelectric and irrigation dam in central Haiti that forms Lake Péligre and plays a key role in the country’s power supply and water management.
  • C. Daivões Dam
    Daivões Dam is a hydroelectric dam located on Portugal’s Tâmega River, forming part of the Tâmega electroproduction system.
  • D. Gotvand Dam
    Gotvand Dam is a major rock-fill embankment dam in southwestern Iran, built on the Karun River for hydroelectric power generation, irrigation, and water regulation.
  • E. Edea Dam
    Edea Dam is a major hydroelectric power facility in Cameroon that harnesses the flow of the Sanaga River to generate electricity.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4a1a09881908d97270d6971a25a completed April 16, 2026, 10:06 a.m.
NER Named-entity recognition batch_69e677e886a08190952b828fedd2a411 completed April 20, 2026, 7 p.m.
Created at: April 16, 2026, 11:22 a.m.