Triple

T20315167
Position Surface form Disambiguated ID Type / Status
Subject Southern Electric E510359 entity
Predicate regulatedBy P86 FINISHED
Object Office of Electricity Regulation NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Office of Electricity Regulation | Statement: [Southern Electric, regulatedBy, Office of Electricity Regulation]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Office of Electricity Regulation
Context triple: [Southern Electric, regulatedBy, Office of Electricity Regulation]
  • A. Central Electricity Regulatory Commission
    The Central Electricity Regulatory Commission is India’s national-level regulatory body responsible for overseeing and regulating the country’s interstate electricity generation, transmission, and trading to ensure fair tariffs and a reliable power sector.
  • B. National Electric Power Regulatory Authority
    The National Electric Power Regulatory Authority (NEPRA) is Pakistan’s federal agency responsible for regulating and overseeing the country’s electric power sector, including licensing, tariffs, and consumer protection.
  • C. Electricity Authority
    The Electricity Authority is New Zealand’s independent regulator responsible for overseeing and promoting the efficient operation of the country’s electricity market.
  • D. Electricity Council
    The Electricity Council was a central public body in the United Kingdom responsible for overseeing and coordinating the nationalized electricity supply industry in England and Wales.
  • E. Electric Reliability Organization
    The Electric Reliability Organization is a regulatory body responsible for developing and enforcing reliability standards to ensure the dependable operation of the bulk power system.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Office of Electricity Regulation
Target entity description: The Office of Electricity Regulation was the former UK government regulator responsible for overseeing and promoting competition in the electricity supply industry before its functions were absorbed into Ofgem.
  • A. Central Electricity Regulatory Commission
    The Central Electricity Regulatory Commission is India’s national-level regulatory body responsible for overseeing and regulating the country’s interstate electricity generation, transmission, and trading to ensure fair tariffs and a reliable power sector.
  • B. National Electric Power Regulatory Authority
    The National Electric Power Regulatory Authority (NEPRA) is Pakistan’s federal agency responsible for regulating and overseeing the country’s electric power sector, including licensing, tariffs, and consumer protection.
  • C. Electricity Authority
    The Electricity Authority is New Zealand’s independent regulator responsible for overseeing and promoting the efficient operation of the country’s electricity market.
  • D. Electricity Council
    The Electricity Council was a central public body in the United Kingdom responsible for overseeing and coordinating the nationalized electricity supply industry in England and Wales.
  • E. Electric Reliability Organization
    The Electric Reliability Organization is a regulatory body responsible for developing and enforcing reliability standards to ensure the dependable operation of the bulk power system.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4c7491c8190961113c4283b10b0 completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e67786f4dc8190b02a6c2a4338362d completed April 20, 2026, 6:59 p.m.
Created at: April 16, 2026, 11:19 a.m.